Holiday Inn, Wembley Stadium Park
November 13 2019by Maximum Climate Control

The Holiday Inn, Wembley Stadium Park, London
This was a 330 Bedroom Hotel re-fit.
The project involved removing the old LPHW heating system and replace the heating with a heat recovery system combined within the building. The Hotel was refurbished with the only the closing of individual floors, while the hotel remained fully operational apart from the floors being worked on. This project took just over a year to complete and was installed using 30 x Daikin VRV heat recovery outdoor systems, connected to 330 x ducted air conditioning indoor fan coils.

All the bedroom units where individually controlled within each room. We also fitted an I Touch manager installed at reception to control any one room at any time if the guest required assistance from there room.
We also designed and installed a trickle vent fresh air system to all 330 bedrooms, to allow natural ventilation of the bedrooms and to be silent even at the 10th floor with strong winter winds, this proved very challenging but the customer is very happy with the end result.
We also refurbished the bathroom extract systems at the same time, and commissioned them.

The whole system was fully commissioned and handed over to the customer on time and within budget.
We also maintain the systems for the client to allow them peace of mind and there 5-year warranty.
Established in 1997, Maximum specialise in the design, installation, service and maintenance of HVAC systems (heating, ventilation and air conditioning), ranging from small heating, cooling and ventilation systems to VRV / VRF systems & heat recovery systems. If you’re interested in our services, be sure to get in touch with our specialists today!
Share this article
Carry on reading
December 09 2025By Maximum Climate Control
How Often Should Restaurants Schedule an Air Conditioning Commercial Service to Avoid Peak Season Breakdowns?
Running a busy restaurant means managing the constant heat of kitchens, the continuous flow of customers, and the pressure of keeping every guest comfortable. Your air conditioning system works harder than most, especially during peak dining hours. A single […]
October 21 2025By Maximum Climate Control
TM44 Air Conditioning Inspections: What are the Evolving Compliance Guidelines for 2025?
Is comfort the only thing you pay for when installing and servicing air conditioning systems in commercial spaces? According to building owners, facility managers, and occupiers, that answer is no. You also receive energy performance and high air quality. All […]




